= NOW 13 WPM = TEXT IS FROM APRIL 2023 QST PAGE 36 = END OF THE 10 METER RESONATOR, I INSTALLED THREE SPACERS THAT WERE 3 INCHES LONG WITH HOLES DRILLED 1/2 INCH FROM EACH END AT SLIGHT ANGLES TO EACH OTHER. CUT THE ANTENNA WIRES FOLLOWING THE DIMENSIONS IN FIGURE 1, CUT THE ANTENNA WIRES, ADDING 12 EXTRA INCHES FOR ADJUSTMENTS. BEGIN ASSEMBLY AT THE FEEDPOINT BOX. THREAD EACH 40 METER WIRE THROUGH THE CENTER HOLES OF THE BOX SPACERS AND OF THE THREE LONG SPACERS, AS WELL AS EITHER HOLE IN THE THREE SHORT SPACERS. ATTACH THE WIRE LUGS AT THE FEEDPOINT END, AND < QST DE W1AW = CONNECT THEM TO THE FEEDPOINT TERMINALS REFER TO FIGURES 3 AND 4. INSTALL THE LOADING COIL AT ITS END AND THE EXTENSIONS FOR 80 METERS. INSTALL THE RESONATOR THE 20 METER RESONATOR IS INSTALLED BY BEING THREADED STRAIGHT THROUGH THE BOTTOM FEED POINT SPACER HOLES. WRAP ELECTRICAL TAPE AROUND THE WIRE OUTSIDE OF EACH SPACER TO KEEP IT CENTERED ON THE FEEDPOINT BOX. INSTALL THE 10 METER RESONATOR WIRE SIMILARLY, USING THE UPPER HOLES IN THE = END OF 13 WPM TEXT = QST DE W1AW <